Storage Tank Addition

Project Gallery

Click to view full size.

Project Details

Design-Build of an additional 1,500,000 gallons carbon steel storage tank with tie-ins to the existing storage and load out systems

Location: Lawler, IA
Project Duration: 7 months

Services

Below are some of the services we provided for this project:

  • Engineering Design
  • Geotechnical & Foundation Analysis and Design
  • Procurement
  • General Contractor
  • General Arrangement
  • P&IDs